General Terms and Conditions

Installation

Our terms and conditions cover what is included free in your standard install and what happens if we need to quote for extra works.

Sometimes issues arise on the day that mean we cant complete your install on the first visit, but if we know about these in advance, we can often resolve them beforehand.

So for the best experience, if you think there’s any reason why we might not be able to complete your install on the day, please let us know.

What’s included:

Pod Point’s standard installation package for the Homecharge Pod Point covers the majority of homes in the UK and includes the following:

  • Fitting of a Pod Point on a brick or plaster wall, or to another suitable permanent structure.
  • Up to 15 metres (50 feet) of cable, run and neatly clipped to the wall between the electricity supply meter / distribution board and the Pod Point.
  • Routing of the cable through a drilled hole in a wall up to 500mm (20 inches) thick, if this is needed.
  • The fitting and testing of electrical connections and protections required for the Pod Point.
  • An additional three way consumer unit, if required.
  • Installation of a Type C MCB and a Type A RCD in an RCBO enclosure.
  • Up to 3 metres (10 feet) of plastic conduit to conceal interior wiring.
  • An earth rod in soft ground, if required.

Some conditions and limitations that you need to know:

  • The Pod Point must be located in your designated off-street parking area and be fixed at a height where it can’t be hit by a vehicle.
  • We can’t fix the cable higher than 1.8 metres (6 feet) above the ground. If fixing higher than this is unavoidable then the installation may need to be paused - in that case we will quote for any extra work needed.
  • We can’t, as part of the standard package, trench the cable underground or suspend it above ground - if something like this is required please talk to us so that we can give you a quote in advance. If we find out on the day that we have to cross a garden or a pathway we may need to pause the job and quote for the extra work needed to trench the cable.
  • When you are using your charger the EV charging lead must remain on your property and must not create a trip hazard for you or anyone else.
  • We can’t run cable under floorboards or through ducting / ceiling voids / wall voids without a draw cord (to pull the cable through), or if the floorboards have not been lifted. We can’t take responsibility for reinstating flooring or other building materials after the cable has been laid.
  • Our experts are not able to work in crawl spaces, on roofs or in lofts if it is deemed unsafe by them.
  • Our experts are not able to work in extreme weather (i.e. flooding or intense rain). If it is not safe to carry on, our expert will do as much as they can and we will return at a later date.
  • If you have purchased a freestanding mount for the Pod Point to be fitted on please be aware that there may be an additional cost for installing this.

What happens if we find that your existing wiring isn’t up to scratch:

  • Pod Point follows BS7671 2008/2015 Amendment 3 Standard Regulations and NICEIC guidelines on Electric Vehicle installations.
  • If we can’t install in line with these rules then your installation will be paused and we will quote for the work needed to meet the required standards.
  • If the existing electrical arrangements at the property are not in line with these rules or there is something else that makes it unsafe for us to install then we will quote for the work needed to meet the required standards.

What happens if your electrical supply is inadequate:

We can only complete the job if the electrical capacity (i.e. main fuse) can support the additional electrical demands of the Pod Point. If the capacity is not sufficient, we might be able to de-rate the Pod Point or we may have to pause the job until your main fuse is upgraded by your electricity supplier.

Timing:

We allocate two hours for standard installations. If we can’t complete on the day because of supply related problems or unexpected extra works then we will reschedule an installation date once the additional works are complete or our quotation for the work has been accepted.

Additional works:

  • If required, your installation project manager or Pod Point Expert will detail required works and provide a no obligation quotation for these services. Quotations are valid for a period of 90 days once issued.
  • If the additional works are minor (less than 2 hours additional works) and can be completed on the day, you will be eligible for a £50 discount if you decide to pay and proceed on the day.
  • If it is determined that an installation cannot be completed on the day, Pod Point will quote for additional works, and a new installation date will be given once payment has been made. Please allow up to 10 working days for a new installation date.
  • If your Pod Point Expert suspects that the installation will not comply with the OZEV grant requirements (see OZEV terms and conditions below), your installation will be paused. Should you disagree with that assessment, you will be given an opportunity to contest this by providing Pod Point with information to state your case to the government, which we can then pass on to the DVLA/OZEV for pre-approval. Should Pod Point receive approval to proceed, a new installation date will be given, please allow up to 10 working days for a new installation date.
  • The owner/customer or a responsible adult of the age of 18 years or over needs to be present on site for the entire duration of the install.

3 year warranty:

EV home chargepoints are covered by a comprehensive 36 month warranty. Any hardware failure should be promptly reported to us via help.ev-charging.uk

Please quote the serial number, the date of installation and a brief description of the fault. The EV technical team will carry out an assessment and will contact you to get further details and if necessary arrange a service visit.

The warranty will be void if the Pod Point unit is opened, modified, tampered with or repair is attempted by anyone other than a EV appointed electrician.

A 24 month extended warranty can be purchased in the checkout, all of the same terms & conditions apply.

Limitation of liability:

In no event will Pod Point accept any liability for any loss, costs or consequential damage due to the use and/or misuse of our hardware or software products except where this is caused by our negligence.

In no event will Pod Point accept any liability for any loss, costs or consequential damage due to the aborted installation of a home chargepoint where it is not safe or practical to install.

This includes, but isn’t limited to, issues related to land ownership or power which can’t be assessed prior to install. In these circumstances we will provide a full refund of all money paid to us (Pod Point) in respect of the planned installation, unless you (the customer) withheld any key information from us. Our liability for any other losses won’t exceed the amount we charge you for your install, except for our liability for personal injury or death caused by our negligence and anything else where our liability can’t be limited by law.

You (the customer) are liable for any costs incurred due to the supply of false, inaccurate or incomplete information to us (EV) in relation to the OZEV EV Chargepoint and EST home charge grants or any other of the services we offer.

EV Chargepoint Grant:

From 1 April 2022, the Office for Zero Emission Vehicles (OZEV) provides the EV Chargepoint Grant to reduce the cost of a home charger (including installation) by up to £350 for eligible customers who are resident in flats and rental properties (see below to check if you’re eligible and for our summary of the OZEV terms and conditions).

If you would like to apply the grant to your order but don’t provide completed documentation to Pod Point then we will pause your installation until you’ve provided this.

If we haven’t received your completed documentation within 3 months of the date of payment then we will be permitted to cancel your installation. If we do this then we’ll be entitled to charge you a £50 administration charge plus any exceptional or unforeseen costs we’ve properly incurred in dealing with your order up to the time it’s cancelled. Where we can, we’ll take this from the payment you’ve already made for your order, and then give you a refund for any excess amount.

The grant is subject to a number of terms and conditions, a summary of which is provided here.

Summary of OZEV terms and conditions:

  • The grant is capped at £350 (including VAT) per installation.
  • The grant is available to people who own and live in a flat and people living in rental accommodation (flats and single-use properties).
  • The grant can only be used for retrofit (existing) properties that are currently occupied.
  • It can’t be claimed retrospectively.
  • Residents must provide evidence of being the registered keeper or lessee, or be named as the primary user of an eligible EV or plug-in vehicle in order to be able to claim the grant.
  • Only one claim per vehicle can be made, even if you own more than one home. A single customer can only claim the grant once in total.
  • A list of qualifying electric vehicles is maintained at: https://www.gov.uk/government/publications/electric-vehicle-homecharge-scheme-eligible-vehicles
  • The grant is only applicable for residential addresses with designated private off-street parking.
  • If you are not the property owner and freeholder of the building, signed written permission and a proof of address from the appropriate owner or management company must be obtained prior to installation of the EV.
  • Any area where the installation of a Pod Point may affect another property owner, written permission and a proof of address from the appropriate owners must be obtained prior to installation of the Pod Point.
  • If you are the property owner and freeholder of a listed building, Pod Point requires listed consent from the local planning authority before an installation can take place.
  • The above is a summary only and not a substitute for reading the full details of the grant terms and conditions which are available here: https://www.gov.uk/government/publications/ev-chargepoint-grant-for-flat-owner-occupiers-and-people-living-in-rented-properties-customer-guidance

Customers who require additional information, or have any queries on the grant process should contact OZEV directly on:

chargepoint.grants@ozev.gov.uk

Carbon Sync:

  • All our chargepoints are supplied with Carbon Sync capability.
  • Carbon Sync allows us to briefly pause charging on instruction from official bodies (for example the national grid) for the purpose of balancing or maintaining stability of the local or national electrical generation or distribution grid. Under normal circumstances, we don’t expect Carbon Sync to have any material effect on charging, however, you agree that Carbon Sync may lead to pauses in charging.

Waste of electronic and electrical equipment:

EV Ltd are compliant with the WEEE (Waste of electronic and electrical equipment) regulations and the PRN is WEE/CH5416WQ.

Partner Installers:

We work with a network of 3rd party installers (“Partner Installers”) alongside our own in-house installation team.

In certain circumstances we may send your order to a Partner Installer so that they can carry out your installation, for example if your installation is non-standard and extra works are required, or if no installation slots are available with our in-house installers.

If we do this before you have made payment:

  • The installer who receives your order will contact you and give you a quote. The cost of your charger, accessories and installation may vary but you can choose not to proceed if you are not happy with the price quoted.
  • If you accept the quote, your contract for the installation will be with the Partner Installer. They will arrange an installation date with you, visit you to carry out the work and deliver your accessories (if they haven’t been sent via post).
  • The installer will also ask you to complete documentation needed to claim the OZEV EVHS grant on your behalf if you have applied it to your order.
  • They will then invoice you directly for your charger and accessories.

In these cases your contract for the installation is with the Partner Installer but you’ll get the same product features, and we require them to give you the same warranty cover as you would if you purchased directly from EV.

If we do this after you have placed an order with us:

  • The installer who receives your order will make contact to arrange an installation date with you, visit you to carry out the work and deliver your accessories (if they haven’t been sent via post).
  • The installer will also ask you to complete documentation needed to claim the OZEV EVHS grant on your behalf (if you have applied it to your order).

In these cases your contract for the installation is with EV (not the Partner Installer).

Local Power Network Conditions

The rate your charger is capable of charging at is ultimately determined by local power network conditions - in other words, how much power is available at the location where it is installed.

These local power network conditions vary continuously due to the local electrical load and also as a result of local generation. If, at any time, there is not enough power available to charge at the maximum rate your charger is capable of, it may be temporarily restricted to a lower charging rate until the local conditions improve.

Local power network conditions are not under Pod Point’s control and therefore Pod Point does not guarantee any particular power output or availability period in relation to your charger, and accepts no liability or responsibility for issues such as performance arising therefrom.